Buenos Aires Project

Tunnel Boring Machine (TBM) was used to excavate the 15.3 km tunnel. Tunneling was segmented into four drives.
A portion of the 15.3 kilometer tunnel excavated. Tunnel alignment had been carefully designed to pass for its entire length under state owned land to avoid long talks and expensive agreements with landowners. Tunnel lining consists of a watertight one pass segmental lining with a 26 mm EPDM gasket plus an external foam gasket. The lining comprises five segments and one key, with only longitudinal joints bolted. Lining life is contractually fixed at 100 years. Access shafts shown below are used for construction purposes; three of the five will be used for future connections and two raising stations for the distribution of potable water.