| The main jack used for pipe jacking. | ![]() |
| A view inside the tunnel. | ![]() |
| Conveyor belt and muck car used to bring out excavated soil from the tunnel. | ![]() |
| An Intermediate Jack was inserted between two pipes to help the main jack in pushing the concrete pipes further. | ![]() |
| TBM Head. | ![]() |
| Concrete pipes jacked inside the tunnel. | ![]() |